«IF THERE’S NO GOAL, YOU CAN’T DO ANYTHING
GREAT IF THE TARGET IS NEGLIGIBLE» Denis Diderot

8 4242 720 678

eagle.ltd@rambler.ru
ru | en

Eagle ltd. waste handling facilities

For realization of hazardous waste handling activities EAGLE ltd. has qualified personnel and specialized, registered in SRWDS (state register of waste disposal sites) sites:

Yablochnoye site

Total squire of site 9749,0 m2. This iste is located on the following address marks: Sakhalin region, Kholms district, Yablochnoye village, at about 5 km to the East from Nevelsk-Kholmsk-Uglegorsk-Boshnyakovo road (68 km). Site has SRWDS # 65-00035-Х-00592-250914.

Annual production capacity of object

Consolidation for further transportation on the continent

up to  8 000 cubic meters.

Neutralization of MSW (Municipal solid waste) equated to them

up to 1 500 cubic meters.

Storage and neutralization of drilling and oily wastes

up to 45 000 cubic meters.

Processing and recycling of wastes

up to 3 000 cubic meters. м.

 

Val site

Site is located in: Sakhalin region, Nogliki district, 3 km to the West of 696 km of Yuzhno-Sakhalinsk-Okha-Moskalvo road, to the West of Val village. Site has SRWDS # 65-00037-Х-00592-250914

Annual production capacity of object

Consolidation for further transportation on the continent

up to 7 000 cubic meters.

Neutralization of MSW (Municipal solid waste) equated to them

up to 1 500 cubic meters.

Storage and neutralization of drilling and oily wastes

up to 45 000 cubic meters.

Processing and recycling of wastes

Up to 2 500 cubic meters.

  

 

Odoptu site

Site in Okha district, with address marks: 1.9 km to the South-West of Odoptu river creek, Sakhalin region, Okha district – Total square is 2200 m2. Site has SRWDS # 65-00034-Х-00592-250914.

Annual production capacity of object

Consolidation for further transportation on the continent

up to  8 000 cubic meters.

Neutralization of MSW (Municipal solid waste) equated to them

up to 1 500 cubic meters.

Storage and neutralization of drilling and oily wastes

up to 45 000 cubic meters.

Processing and recycling of wastes

up to 3 000 cubic meters. м.

  

EQUIPMENT PRODUCTIVITY ON SITES

No Unit name Max productivity t/hour Q-ty of hours worked per day Max productivity t/hour Work days in year Max productivity t/year Q-ty of units Total
Yablochnoye site
1 IN-50.4KVM unit 0,15 24 3,6 264 950,4 1 950,4
2 Forsage-1 unit    0,025 12 0,3 288 86,4 2 172,8
3 USO-200 unit 0,025 12 0,3 288 86,4 2 172,8
4 UZG-1M unit 4 24 96 264 25344 1 25344
  Total 4,2   100,2   26467,2 6 26640
Odoptu site
1 IN-50.02KMM unit 0,05 24 1,2 264 316,8 1 316,8
2 Forsage-1 unit    0,025 12 0,3 288 86,4 2 172,8
3 USO-200 unit 0,025 12 0,3 288 86,4 2 172,8
4 UZG-1M unit 4 24 96 264 25344 1 25344
  Total 4,1   97,8   25833,6 6 26006,4
Val site
1 IN-50.02KMM unit 0,05 24 1,2 264 316,8 1 316,8
2 Forsage-1 unit    0,025 12 0,3 288 86,4 2 172,8
3 USO-200 unit 0,025 12 0,3 288 86,4 2 172,8
4 UZG-1M unit 4 24 96 264 25344 1 25344
  Total 4,1   97,8   25833,6 6 26006,4
Uspenovka site
1 IN-50.02KMM unit 0,05 24 1,2 264 316,8 1 316,8
2 IU-300 unit 0,18 24 4,32 264 1140,48 1 1140,48
3 Forsage-1 unit    0,025 12 0,3 288 86,4 2 172,8
4 USO-200 unit 0,025 12 0,3 288 86,4 2 172,8
  Total 0,28   6,12   1630,08 6 1802,88

General scheme of sites is shown below

Our customers